Project: 4480 Methane Recovery and Utilization at PT. Musim Mas Palm Oil Mill in Pangkalan Lesung, Riau Indonesia - History
Project 4480: Methane Recovery and Utilization at PT. Musim Mas Palm Oil Mill in Pangkalan Lesung, Riau Indonesia

Data before approval of the request for post-registration changes on 15 Mar 2013

Link to PRC form PRC
CDM-PDD project design document (894 KB)


PDD appendices
Appendix 1 - 4480 CER calculations (43 KB)
Appendix 2 - 4480 investment analysis (130 KB)