21:57 23 Jan 25
Project:
4480 Methane Recovery and Utilization at PT. Musim Mas Palm Oil Mill in Pangkalan Lesung, Riau Indonesia
- History
Project | 4480: Methane Recovery and Utilization at PT. Musim Mas Palm Oil Mill in Pangkalan Lesung, Riau Indonesia |
---|
Data before approval of the request for post-registration changes on 15 Mar 2013
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (894 KB)
PDD appendices Appendix 1 - 4480 CER calculations (43 KB) Appendix 2 - 4480 investment analysis (130 KB) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: