12:59 23 Jan 25
Project:
4480 Methane Recovery and Utilization at PT. Musim Mas Palm Oil Mill in Pangkalan Lesung, Riau Indonesia
- Request for post-registration changes
Project | 4480 Methane Recovery and Utilization at PT. Musim Mas Palm Oil Mill in Pangkalan Lesung, Riau Indonesia |
---|---|
PRC ref | PRC-4480-001 |
Process track | Prior approval |
DOE | DNV |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 14 Oct 11 - 13 Oct 18 |
Assessment opinion | Assessment opinion (171 KB) |
Revised PDD | Revised PDD (903 KB) Revised PDD - track changes (916 KB) |
Supplementary documents |
Appendix 1 - 4480 CER calculations.xlsx (43 KB)
Appendix 2 - 4480 investment analysis.xls (142 KB) |
Signed form | Signed form (181 KB) |
DOE clarification |
DOE clarification 1 - Pangkalan Lesung revised PDD PRC clarification request (clean version).pdf (903 KB)
DOE clarification 2 - Pangkalan Lesung revised PDD PRC clarification request (track changes).pdf (906 KB) |
VVS version | VVS 2.0 |
Current status | 15 Mar 13 -
Approved
Effective approval date: 15 Mar 13
|
Historic statuses |
16 Jan 13 -
Published 30 Jan 13 - Awaiting DOE clarifications 08 Feb 13 - DOE clarifications received 08 Feb 13 - Summary note being prepared 22 Feb 13 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: