Project: 1738 MY08-WWP-36, Methane Recovery in Wastewater Treatment, Pahang, Malaysia - History
Project 1738: MY08-WWP-36, Methane Recovery in Wastewater Treatment, Pahang, Malaysia
Request for review Request 1
Request 2
Request 3

Data before corrections

Amount of Reductions 22,214 metric tonnes CO2 equivalent per annum
CDM-PDD project design document (577 KB)


PDD appendices
Appendix 1 - Excel Sheet1 1738 (99 KB)
Appendix 2 - Excel Sheet2 1738 (30 KB)
Appendix 3 - Excel Sheet3 1738 (95 KB)
Validation Report Validation report (1278 KB)

Data before approval of the request for post-registration changes on 06 Mar 2013

Link to PRC form PRC
CDM-PDD project design document (413 KB)


PDD appendices
Appendix 1 - Excel Sheet1 1738 (99 KB)
Appendix 2 - Excel Sheet2 1738 (30 KB)
Appendix 3 - PDD_calculation_revised (83 KB)