Project: 1738 MY08-WWP-36, Methane Recovery in Wastewater Treatment, Pahang, Malaysia - Request for post-registration changes
Project 1738 MY08-WWP-36, Methane Recovery in Wastewater Treatment, Pahang, Malaysia
PRC ref PRC-1738-001
Process track Prior approval
DOE SIRIM
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 15 Nov 10 - 14 Nov 17
Assessment opinion Assessment opinion (169 KB)
Revised PDD Revised PDD (414 KB)   Revised PDD - track changes (438 KB)
Supplementary documents
Signed form Signed form (514 KB)
DOE clarification
VVS version VVS 2.0
Current status 06 Mar 13 - Approved
Effective approval date: 06 Mar 13
Historic statuses 29 Jan 13 - Published
29 Jan 13 - Summary note being prepared
13 Feb 13 - Awaiting EB decision