Project: 0971 7.5 MW Grid-Connected Biomass Power Project, by Ravi Kiran Power Projects Private Limited - Issuance Request
Project 0971: 7.5 MW Grid-Connected Biomass Power Project, by Ravi Kiran Power Projects Private Limited
 
ISSUANCE STATUS Issued (on 24 Jun 09)  
Monitoring period 13 Jul 07 - 31 Aug 08
Monitoring report Monitoring report (75 KB)
 
Request for issuance Signed form (659 KB)

Before corrections:
Signed form (659 KB)
Amount of CERs CERs issued up to 31 December 2012: 30,920
Serial Range: Block start: IN-5-67431324-1-1-0-971     Block end: IN-5-67462243-1-1-0-971


Before corrections:
30920
Verification and certification reports Certification report (140 KB)
Verification report (140 KB)

Before corrections:
Certification report (122 KB)
Verification report (122 KB)
Additional documents 0971MR (77 KB)
0971 CER Sheet (38 KB)

Before corrections:
0971MR (77 KB)
0971 CER Sheet (38 KB)
Request for review Request 1
Request 2
Request 3