Project: 0838 GHG emission reduction by thermal oxidation of HFC 23 at Navin Fluorine International Limited (NFIL), Surat, Gujarat, India - Issuance Request
Project 0838: GHG emission reduction by thermal oxidation of HFC 23 at Navin Fluorine International Limited (NFIL), Surat, Gujarat, India
 
ISSUANCE STATUS Issued (on 10 Jan 11)  
Monitoring period 01 Aug 09 - 30 Nov 09
Monitoring report Monitoring report (248 KB)
 
Request for issuance Signed form (905 KB)

Before corrections:
Signed form (905 KB)
Amount of CERs CERs issued up to 31 December 2012: 1,345,486
Serial Range: Block start: IN-5-82718660-1-1-0-838     Block end: IN-5-84064145-1-1-0-838


Before corrections:
1345486
Verification and certification reports Certification report (307 KB)
Verification report (307 KB)

Before corrections:
Certification report (274 KB)
Verification report (274 KB)
Additional documents CER Calculation Spreadsheet (186 KB)
Monitoring Report Version 3_dd. 16102010 Clean (251 KB)

Before corrections:
CER Calculation Spreadsheet (186 KB)
Monitoring Report Version 2 (248 KB)
Request for review Request 1
Request 2
Request 3


EB meeting: EB56
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Combined DOE and PP Response (34 KB)
Annex 1: Monthly Calibration record for FT105 against FT 102 (537 KB)
Annex 2: Calibration certificate of FT 105 NG on 08062009 by external agency Endress +Hauser (532 KB)
Annex 3: Calibration certificate of FT 102 NG on 08062009 by external agency Endress +Hauser (528 KB)
Annex 4: Monthly Calibration record for FT103 against FT 110 (489 KB)
Annex 5: Calibration certificate of FT 103 dated 09062009 by external agency KROHNE Marshal (394 KB)
Annex 6: Calibration certificate of FT 110 dated 09062009 by external agency KROHNE Marshal (390 KB)
Annex 7: Monthly calibration record for the FT 121 (492 KB)
Annex 8: Monthly connection check of FT 121 at the plant (433 KB)
Annex 9: Calibration certification of FT121 (578 KB)
Annex 10: SOP NFIL Pitot Tube calibration procedure (1236 KB)
Annex 11: MCI 32 Calibration certificate (1021 KB)
Review Scope (130 KB)

EB meeting: EB58
(at which the report of the review team was/will be considered)