14:42 28 Dec 25
Project:
0834 Egyptian Brick Factory GHG Reduction Project
- History
| Project | 0834: Egyptian Brick Factory GHG Reduction Project |
|---|
Data before corrections
| Amount of Reductions | 455,270 metric tonnes CO2 equivalent per annum |
|---|---|
| CDM-PDD |
project design document (817 KB)
PDD appendices Appendix 1 - M-NPV analysis (133 KB)
|
| Validation Report |
Validation report (992 KB)
|
Data before approval of the request for post-registration changes on 01 Oct 2014
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (1264 KB)
|
| Validation opinion on changes in PDD |
Validation opinion on changes in PDD (434 KB)
|
Data before approval of the request for post-registration changes on 15 May 2014
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (908 KB)
PDD appendices Appendix 1 - NPV analysis (50 KB)
Appendix 2 - ER calculation spreadsheet (136 KB)
Appendix 3 - List of brick factories (60 KB)
|

project design document
Appendix 1 - M-NPV analysis
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: