Project: 0693 Votorantim’s Hydropower Plant with existing reservoir “Pedra do Cavalo” CDM Project - Crediting Period Renewal Request
[]
Project 0693: Votorantim’s Hydropower Plant with existing reservoir “Pedra do Cavalo” CDM Project

- project design document (774 KB)

PDD appendices
Appendix 1 - 20190805_PCavalo_CERs_v.3.xls (91 KB)

- crediting period renewal form (181 KB)
Methodologies Used ACM0002 ver. 19 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 101,417 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (793 KB)
Renewal Date 08 Nov 19 (Renewable)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period (requested for renewal) 09 Apr 19 - 08 Apr 26

Other crediting period(s): 09 Apr 05 - 08 Apr 12 09 Apr 12 - 08 Apr 19
Requests for Issuance
and related documentation