14:16 18 Jan 26
Project:
0693 Votorantim’s Hydropower Plant with existing reservoir “Pedra do Cavalo” CDM Project
- Crediting Period Renewal Request
[]
| Project |
0693: Votorantim’s Hydropower Plant with existing reservoir “Pedra do Cavalo” CDM Project
- project design document (774 KB)
PDD appendices Appendix 1 - 20190805_PCavalo_CERs_v.3.xls (91 KB)
- crediting period renewal form (181 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 101,417 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (793 KB)
|
| Renewal Date | 08 Nov 19 (Renewable) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period (requested for renewal) |
09 Apr 19 - 08 Apr 26
Other crediting period(s): 09 Apr 05 - 08 Apr 12 09 Apr 12 - 08 Apr 19 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - 20190805_PCavalo_CERs_v.3.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: