13:23 23 Nov 24
Project:
0693 Votorantim’s Hydropower Plant with existing reservoir “Pedra do Cavalo” CDM Project
- Crediting Period Renewal Request
[]
Project |
0693: Votorantim’s Hydropower Plant with existing reservoir “Pedra do Cavalo” CDM Project
- project design document (692 KB) PDD appendices Appendix 1 - 0693- CER sheet- 2012 05 29 (76 KB) - crediting period renewal form (112 KB) |
---|---|
Methodologies Used |
ACM0002 ver. 12 -
Consolidated baseline methodology for grid-connected electricity generation from renewable sources
|
VVS Version | |
Standardized baselines used | N/A |
Amount of Reductions | 105,952 metric tonnes CO2 equivalent per annum |
Validation Opinion | Validation opinion (606 KB) |
Renewal Date | 09 Aug 12 (Renewable) (view history) |
Crediting Period (requested for renewal) |
09 Apr 12 - 08 Apr 19
Other crediting period(s): 09 Apr 05 - 08 Apr 12 09 Apr 19 - 08 Apr 26 |
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: