02:52 11 Nov 25
Project:
8427 Los Hierros Hydroelectric Power Plant
- Crediting Period Renewal Request
[]
| Project |
8427: Los Hierros Hydroelectric Power Plant
- project design document (2311 KB)
PDD appendices Appendix 1 - ER spreadsheet (21 KB)
Appendix 2 - Untitled (uploaded 08 Apr 22 10:20:02) (579 KB)
- crediting period renewal form (89 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 20 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 3.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 50,182 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (276 KB)
|
| Renewal Date | 17 Sep 22 (Renewable) Provisional (awaiting guidance from the CMP at CMP 16) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period (requested for renewal) |
12 Apr 21 - 11 Apr 28
Other crediting period(s): 12 Apr 14 - 11 Apr 21 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER spreadsheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: