Project: 1693 HITECH CDM CPP - History
Project 1693: HITECH CDM CPP
Request for review Request 1
Request 2
Request 3


EB meeting: EB42
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE Initial comments (139 KB)
Appendix -1 - Levelized Cost of 8.63 MW (318 KB)
Appendix -2 - Levelized Cost of combination (395 KB)
PP Initial comments (89 KB)
Annex-1 Tarrif Order FY05 page73 (18 KB)
Annex-2 UNFCCC verified CERs (26 KB)
Annex-3 Suppler Power Plant (24 KB)
Annex-4 104% PLF in AFBC (157 KB)
Annex-5 95% PLF in AFBC (152 KB)
Annex-6 SIPB data 2006-07 (35 KB)
Annex-7 SIPB data 2007-08 (43 KB)
ANNEX-8 list of proposed captive power plant from MOEF (101 KB)
Review Scope (100 KB)

EB meeting: EB43
(at which the report of the review team was/will be considered)

Data before corrections

CDM-PDD project design document (1414 KB)
Validation Report Validation report (2787 KB)