20:41 21 Sep 26
Project:
1693 HITECH CDM CPP
- History
| Project | 1693: HITECH CDM CPP |
|---|---|
| Request for review |
Request 1
Request 2 Request 3 EB meeting: EB42 (at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team) Initial comments: DOE Initial comments (139 KB)
Appendix -1 - Levelized Cost of 8.63 MW (318 KB)
Appendix -2 - Levelized Cost of combination (395 KB)
PP Initial comments (89 KB)
Annex-1 Tarrif Order FY05 page73 (18 KB)
Annex-2 UNFCCC verified CERs (26 KB)
Annex-3 Suppler Power Plant (24 KB)
Annex-4 104% PLF in AFBC (157 KB)
Annex-5 95% PLF in AFBC (152 KB)
Annex-6 SIPB data 2006-07 (35 KB)
Annex-7 SIPB data 2007-08 (43 KB)
ANNEX-8 list of proposed captive power plant from MOEF (101 KB)
|
| Review |
Scope (100 KB)
EB meeting: EB43 (at which the report of the review team was/will be considered) |
Data before corrections
| CDM-PDD |
project design document (1414 KB)
|
|---|---|
| Validation Report |
Validation report (2787 KB)
|

DOE Initial comments
Appendix -1 - Levelized Cost of 8.63 MW
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: