Project: 1642 SHYAM DRI WHR CPP - History
Project 1642: SHYAM DRI WHR CPP
Request for review Request 1
Request 2
Request 3
Request 4


EB meeting: EB41
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE Initial comments (129 KB)
Appendix - 1 - Letter from Avani (222 KB)
Appendix - 2 - Letter from HML (707 KB)
Appendix - 3 - Orissa Tariff Schedule (118 KB)
PP Initial comments (141 KB)
ANNEX-1 cost of power generation in coal based plants grid (3272 KB)
ANNEX-2 (ARTICLE FROM A N JHA) (2952 KB)
ANNEX-4 (NITRATE STRESS IN WHRB along with DRI KILNS) (413 KB)
ANNEX-5 Clarification from Popuri Engg (709 KB)
ANNEX-7 list of clearance required (23 KB)
Annex-8 List of Power Project in Orrisa as per MOEF (499 KB)
Review Scope (91 KB)

EB meeting: EB42
(at which the report of the review team was/will be considered)

Data before corrections

CDM-PDD project design document (704 KB)


PDD appendices
Appendix 1 - Cost Comparision Shyam DRI (24 KB)
Appendix 2 - S A Shyam DRI 1 (299 KB)
Appendix 3 - Emission Factor-Shyam DRI (167 KB)
Appendix 4 - Assumption and Results Shyam DRI (22 KB)
Appendix 5 - S A Shyam DRI 2 (299 KB)
Appendix 6 - Total Capacity Shyam DRI (235 KB)
Appendix 7 - Without CDM Shyam DRI (299 KB)
Appendix 8 - Board Res Shyam DRI1 (225 KB)
Validation Report Validation report (2795 KB)