Project: 1321 Baxianyuan 27 MW Hydropower Project - History
Project 1321: Baxianyuan 27 MW Hydropower Project
Request for review Request 1
Request 2
Request 3


EB meeting: EB37
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE initial comments (267 KB)
Annex 1 - Board meeting minutes (198 KB)
Annex 2 - Emission reductions cooperation agreement (191 KB)
Annex 3 - Photos for the beginning of the construction activity (745 KB)
Annex 4 - Economic evaluation code (504 KB)
Annex 5 - Revised PDD (1586 KB)
Annex 6 - Detailed IRR calculation - revised - (100 KB)
Annex 7 - Position letter from stakeholder (134 KB)
Annex 8 - Revised validation report (3295 KB)
PP initial comments (1320 KB)
Annex 1 (504 KB)
Annex 2 (100 KB)
Annex 3 (198 KB)
Annex 4 (191 KB)
Annex 5 (745 KB)
Annex 6 (134 KB)

Data before corrections

CDM-PDD project design document (1538 KB)


PDD appendices
Appendix 1 - IRR calculation- Baxianyuan (100 KB)
Validation Report Validation report (3435 KB)

Data before acceptance of changes in PDD on 26 Jul 2011

CDM-PDD project design document (1598 KB)


PDD appendices
Appendix 1 - Annex1 -Board meeting minutes-Baxianyuan (198 KB)
Appendix 2 - Annex2 -Emission reductions cooperation agreement-Baxianyuan (191 KB)
Appendix 3 - Annex3 -Photos for the begining of the construction-Baxianyuan (745 KB)
Appendix 4 - Annex4 -Economic evaluation code-Baxianyuan (504 KB)
Appendix 5 - Annex5 --Detailed IRR calculation revised-Baxianyuan (100 KB)
Appendix 6 - Annex6 ---Position paper from stakeholder-Baxianyuan (134 KB)