PoA 7847 : Programme for Grid Connected Renewable Energy in the Mediterranean Region
PoA title Programme for Grid Connected Renewable Energy in the Mediterranean Region
- POA design document (1902 KB)

- POA registration request form (44 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
CPAs - CPA design document (1132 KB)

Initially submitted at the time of requesting registration of the POA:
- Power station 25 MWp in ErRachidia Town in Morocco (CPA0001)

(view all CPAs)
Host Parties Egypt , involved indirectly approval (680 KB)

Lebanon , involved indirectly approval (605 KB)

Morocco , involved indirectly approval (677 KB)

Tunisia , involved indirectly approval (637 KB)
Other Parties Involved France , involved indirectly approval (599 KB) authorization (599 KB)
Authorized Participants: CDC Climat Asset Management
Coordinating/Managing Entity Renewable Energy for the Mediterranean (R.E.M.)
DOE GLC
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodology Used ACM0002 ver. 12 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
VVS Version
Amount of Reductions (PoA) 20,883 metric tonnes CO2 equivalent per annum
Amount of Reductions (Initial CPAs) 20,883 metric tonnes CO2 equivalent per annum
Fee level USD 2676.6 (deferred)
Validation Report Validation report (5075 KB)
Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 19/11/2013
Registration Date 29 Oct 12  
Renewal Period 29 Oct 12 - 28 Oct 19
PoA Duration 31 Dec 12 - 30 Dec 40
Requests for Issuance
and related documentation