07:30 25 Oct 25
PoA
7847 :
Programme for Grid Connected Renewable Energy in the Mediterranean Region
| PoA title |
Programme for Grid Connected Renewable Energy in the Mediterranean Region
- POA design document (1902 KB)
- POA registration request form (44 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| CPAs |
-
CPA design document (1132 KB)
Initially submitted at the time of requesting registration of the POA: - Power station 25 MWp in ErRachidia Town in Morocco (CPA0001) (view all CPAs) |
| Host Parties |
Egypt
, involved indirectly
approval (680 KB)
Lebanon , involved indirectly approval (605 KB)
Morocco , involved indirectly approval (677 KB)
Tunisia , involved indirectly approval (637 KB)
|
| Other Parties Involved |
France
, involved indirectly
approval (599 KB)
authorization (599 KB)
Authorized Participants: CDC Climat Asset Management |
| Coordinating/Managing Entity |
Renewable Energy for the Mediterranean (R.E.M.)
|
| DOE | GLC |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodology Used |
ACM0002 ver. 12 -
Consolidated baseline methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| VVS Version | |
| Amount of Reductions (PoA) | 20,883 metric tonnes CO2 equivalent per annum |
| Amount of Reductions (Initial CPAs) | 20,883 metric tonnes CO2 equivalent per annum |
| Fee level | USD 2676.6 (deferred) |
| Validation Report |
Validation report (5075 KB)
Public availability information Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 19/11/2013 |
| Registration Date | 29 Oct 12 |
| Renewal Period | 29 Oct 12 - 28 Oct 19 |
| PoA Duration | 31 Dec 12 - 30 Dec 40 |
| Requests for Issuance
and related documentation |
|

POA design document
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: