07:33 08 Oct 24
PoA
7847 :
Programme for Grid Connected Renewable Energy in the Mediterranean Region
PoA title |
Programme for Grid Connected Renewable Energy in the Mediterranean Region
- POA design document (1902 KB) - POA registration request form (44 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
CPAs |
-
CPA design document (1132 KB)
Initially submitted at the time of requesting registration of the POA: - Power station 25 MWp in ErRachidia Town in Morocco (CPA0001) (view all CPAs) |
Host Parties |
Egypt
, involved indirectly
approval (680 KB)
Lebanon , involved indirectly approval (605 KB) Morocco , involved indirectly approval (677 KB) Tunisia , involved indirectly approval (637 KB) |
Other Parties Involved |
France
, involved indirectly
approval (599 KB)
authorization (599 KB)
Authorized Participants: CDC Climat Asset Management |
Coordinating/Managing Entity |
Renewable Energy for the Mediterranean (R.E.M.)
|
DOE | GLC |
Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
Activity Scale | LARGE |
Methodology Used |
ACM0002 ver. 12 -
Consolidated baseline methodology for grid-connected electricity generation from renewable sources
|
Standardized baselines used | N/A |
VVS Version | |
Amount of Reductions (PoA) | 20,883 metric tonnes CO2 equivalent per annum |
Amount of Reductions (Initial CPAs) | 20,883 metric tonnes CO2 equivalent per annum |
Fee level | USD 2676.6 (deferred) |
Validation Report |
Validation report (5075 KB)
Public availability information Link to information uploaded for public availability |
Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 19/11/2013 |
Registration Date | 29 Oct 12 |
Renewal Period | 29 Oct 12 - 28 Oct 19 |
PoA Duration | 31 Dec 12 - 30 Dec 40 |
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: