23:23 05 Apr 25
CPA
7847-P1-0001-CP1 :
Power station 25 MWp in ErRachidia Town in Morocco (CPA0001)
PoA | 7847: Programme for Grid Connected Renewable Energy in the Mediterranean Region |
---|---|
CPA |
Power station 25 MWp in ErRachidia Town in Morocco (CPA0001)
![]() Additional documents for this specific CPA ![]() ![]() ![]() ![]() Additional inclusion documents ![]() |
Host Parties | Morocco |
Amount of Reductions | 20,883 metric tonnes CO2 equivalent per annum |
Crediting Period | 01 May 2013 - 30 Apr 2020 (Renewable - Expired) . No further renewal |
Inclusion date | 29 Oct 2012 (submitted at the time of requesting registration of the PoA) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: