PoA 9477 : Macedonian Microscale Grid-connected Hydroelectricity Programme
PoA title Macedonian Microscale Grid-connected Hydroelectricity Programme
- POA design document (973 KB)

PoA DD appendices at the time of registration
Appendix 1 - Macedonian SHPP PoA_ER_ver.1.2.xlsx (584 KB)


- POA registration request form (174 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
CPAs - CPA design document (535 KB)

Initially submitted at the time of requesting registration of the POA:
- MAC0001 – Jablanica

(view all CPAs)
Host Parties North Macedonia , involved indirectly approval (1170 KB)
Other Parties Involved Netherlands , involved indirectly approval (137 KB) authorization (137 KB)
Authorized Participants: Camco Carbon International Limited
Coordinating/Managing Entity Camco Carbon International Limited
DOE BVI
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale SMALL
Methodology Used AMS-I.D. ver. 17 - Grid connected renewable electricity generation
Standardized baselines used N/A
VVS Version
Amount of Reductions (PoA) 10,590 metric tonnes CO2 equivalent per annum
Amount of Reductions (Initial CPAs) 10,590 metric tonnes CO2 equivalent per annum
Fee level USD 0.0
Validation Report Validation report (2920 KB)
Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 01/11/2013
Registration Date 31 Dec 12  
Renewal Period 31 Dec 12 - 30 Dec 19
PoA Duration 07 Mar 12 - 06 Mar 40
Requests for Issuance
and related documentation