20:43 26 Jan 26
CPA
9477-P1-0001-CP1 :
MAC0001 – Jablanica
| PoA | 9477: Macedonian Microscale Grid-connected Hydroelectricity Programme |
|---|---|
| CPA |
MAC0001 – Jablanica
cpa design document (635 KB)
Additional documents for this specific CPA Appendix 1 - Macedonian SHPP PoA_ER_ver.1.2.xlsx (584 KB)
Additional inclusion documents CPA inclusion form (349 KB)
|
| Host Parties | North Macedonia |
| Amount of Reductions | 10,590 metric tonnes CO2 equivalent per annum |
| Crediting Period | 01 Jan 2015 - 31 Dec 2024 (Fixed) |
| Inclusion date | 31 Dec 2012 (submitted at the time of requesting registration of the PoA) |

cpa design document
Appendix 1 - Macedonian SHPP PoA_ER_ver.1.2.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: