08:36 12 Nov 25
PoA
6035 :
UAE Solar Programme of Activities
| PoA title |
UAE Solar Programme of Activities
- POA design document (1011 KB)
PoA DD appendices at the time of registration Appendix 1 - OM EF of the ADWEA grid (120 KB)
Appendix 2 - EF DEWA calculation (248 KB)
Appendix 3 - EF FEWA calculation (250 KB)
Appendix 4 - UAE Solar PoA - Generic ER Calculation (46 KB)
- POA registration request form (139 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| CPAs |
Initially submitted at the time of requesting registration of the POA: - D001 Dubai 3 MW Photovoltaic Power Plant of the UAE Solar Programme of Activities |
| Host Parties |
United Arab Emirates
, involved indirectly
approval (127 KB)
authorization (127 KB)
Authorized Participants: Dubai Carbon Centre of Excellence |
| Other Parties Involved | n/a |
| Coordinating/Managing Entity |
Dubai Electricity & Water Authority (DEWA)
|
| DOE | AENOR |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodology Used |
ACM0002 ver. 13 -
Consolidated baseline methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| VVS Version | |
| Amount of Reductions (PoA) | 3,928 metric tonnes CO2 equivalent per annum |
| Amount of Reductions (Initial CPAs) | 3,928 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
Validation report (1313 KB)
Public availability information Link to information uploaded for public availability |
| Modalities of Communication |
|
| Registration Date | Withdrawn (view history) |
| Renewal Period | 7 years, starting from the date of registration of the PoA |
| PoA Duration | 01 Oct 13 - 30 Sep 41 |

POA design document
Appendix 1 - OM EF of the ADWEA grid
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: