10:29 12 Nov 25
CPA
6035-P1-0001-CP1 :
D001 Dubai 3 MW Photovoltaic Power Plant of the UAE Solar Programme of Activities
| PoA | 6035: UAE Solar Programme of Activities |
|---|---|
| CPA |
D001 Dubai 3 MW Photovoltaic Power Plant of the UAE Solar Programme of Activities
cpa design document (775 KB)
Additional documents for this specific CPA Appendix 1 - Dubai 3 MW Photovoltaic Solar Power Plant-ER Calculation_V2 (40 KB)
Appendix 2 - VAL_REP_D001 Dubai 3 MW Photovoltaic Power Plant of the UAE Solar PoA_v3.pdf (1114 KB)
Additional inclusion documents CPA inclusion form (143 KB)
|
| Host Parties | United Arab Emirates |
| Amount of Reductions | 3,928 metric tonnes CO2 equivalent per annum |
| Crediting Period |
01 Jan 2014
-
31 Dec 2020
(Renewable - Expired)
. No further renewal
Crediting period of the CPA starts on the date specified above or on the date of inclusion, whichever is later
|

cpa design document
Appendix 1 - Dubai 3 MW Photovoltaic Solar Power Plant-ER Calculation_V2
Crediting period of the CPA starts on the date specified above or on the date of inclusion, whichever is later
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: