PoA 9206 : RE2Grid PoA
PoA title RE2Grid PoA
- POA design document (833 KB)

PoA DD appendices at the time of registration
Appendix 1 - Annex 1 Philippines PoA 26_12 (97 KB)
Appendix 2 - Annex 2 Philippines PoA 26_12 (409 KB)


- POA registration request form (116 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
CPAs - CPA design document (873 KB)

Initially submitted at the time of requesting registration of the POA:
- CPA #1 Bulalacao Wind Farm

(view all CPAs)
Host Parties Philippines , involved indirectly approval (675 KB) authorization (675 KB)
Authorized Participants: Bulalacao Wind Power Corp.
Other Parties Involved Sweden , involved indirectly approval (365 KB) authorization (365 KB)
Authorized Participants: Cornland International AB
Coordinating/Managing Entity Carbonergy Business Consultancy Services
DOE TÜV SÜD
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodology Used ACM0002 ver. 13 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
VVS Version
Amount of Reductions (PoA) 53,543 metric tonnes CO2 equivalent per annum
Amount of Reductions (Initial CPAs) 53,543 metric tonnes CO2 equivalent per annum
Fee level USD 9208.6
Validation Report Validation report (2805 KB)
Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 15/05/2014
Registration Date 27 Dec 12  
Renewal Period 27 Dec 12 - 26 Dec 19
PoA Duration 17 Jul 12 - 16 Jul 40
Requests for Issuance
and related documentation