CPA 9206-P1-0001-CP1 : CPA #1 Bulalacao Wind Farm
PoA 9206: RE2Grid PoA
CPA CPA #1 Bulalacao Wind Farm
cpa design document (394 KB)

Additional documents for this specific CPA
Appendix 1 - CPA ER calculation Philippines PoA 26_12 (49 KB)
Appendix 2 - 91 - Bulalacao_IRR_model_v3_rev.xlsx (100 KB)

Additional inclusion documents
CPA inclusion form (73 KB)
Host Parties Philippines
Amount of Reductions 53,543 metric tonnes CO2 equivalent per annum
Crediting Period 01 Jan 2016 - 31 Dec 2022 (Renewable - Expired) . No further renewal
Inclusion date 27 Dec 2012 (submitted at the time of requesting registration of the PoA)