21:29 13 Nov 25
PoA
5324 :
Than Thien Small Hydropower Programme of Activities Managed by INTRACO
| PoA title |
Than Thien Small Hydropower Programme of Activities Managed by INTRACO
- POA design document (1238 KB)
PoA DD appendices at the time of registration Appendix 1 - Starting date_Than Thien (1203 KB)
Appendix 2 - Evidences_Than Thien (294 KB)
Appendix 3 - Than Thien PoA_GEF Calculation Sheet (134 KB)
- POA registration request form (425 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| CPAs |
-
CPA design document (288 KB)
Initially submitted at the time of requesting registration of the POA: - Nhan Co Hydropower Project (view all CPAs) |
| Host Parties |
Viet Nam
, involved indirectly
approval (2132 KB)
authorization (2132 KB)
Authorized Participants: Investment and Trade Consultancy Company Limited (INTRACO) |
| Other Parties Involved |
Netherlands
, involved indirectly
approval (271 KB)
authorization (271 KB)
Authorized Participants: B.V. Mabanaft (withdrawn) ; Gunvor International B.V., Amsterdam, Geneva Branch (withdrawn) Germany , involved indirectly approval (1078 KB)
authorization (1078 KB)
Authorized Participants: Carbonbay GmbH & Co. KG |
| Coordinating/Managing Entity |
Investment and Trade Consultancy Company Limited (INTRACO)
|
| DOE | TUV RHEIN |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodology Used |
AMS-I.D. ver. 17 -
Grid connected renewable electricity generation
|
| Standardized baselines used | N/A |
| VVS Version | |
| Amount of Reductions (PoA) | 3,386 metric tonnes CO2 equivalent per annum |
| Amount of Reductions (Initial CPAs) | 3,386 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
Validation report (924 KB)
Public availability information Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 21/11/2014 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 11/08/2017 MoC Annex 2 (Withdraw Project Participant) valid as of 21/11/2014 MoC Annex 2 (Withdraw Project Participant) valid as of 21/11/2014 MoC Annex 2 (Add Project Participant) valid as of 20/11/2014 |
| Registration Date | 20 Apr 12 |
| Renewal Period | 20 Apr 12 - 19 Apr 19 |
| PoA Duration | 10 Oct 10 - 09 Oct 38 |
| Requests for Issuance
and related documentation |
|

POA design document
Appendix 3 - Than Thien PoA_GEF Calculation Sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: