02:06 13 Nov 25
PoA
8824 :
Programme for SSC Hydropower Plants in rural areas
| PoA title |
Programme for SSC Hydropower Plants in rural areas
- POA design document (1355 KB)
PoA DD appendices at the time of registration Appendix 1 - ER_Programme for SSC Hydropower Plants in rural areas CPA#1_Final (39 KB)
- POA registration request form (1580 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| CPAs |
Initially submitted at the time of requesting registration of the POA: - Programme for SSC Hydropower Plants in rural areas CPA # 1 (view all CPAs) |
| Host Parties |
China
, involved directly
approval (1495 KB)
authorization (1495 KB)
Authorized Participants: Department of Climate Change, National Development and Reform Commission of China ; |
| Other Parties Involved | n/a |
| Coordinating/Managing Entity |
Zhongtannengtou Tech Co., Ltd.
|
| DOE | ERM CVS |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodology Used |
AMS-I.D. ver. 17 -
Grid connected renewable electricity generation
|
| Standardized baselines used | N/A |
| VVS Version | |
| Amount of Reductions (PoA) | 18,228 metric tonnes CO2 equivalent per annum |
| Amount of Reductions (Initial CPAs) | 18,228 metric tonnes CO2 equivalent per annum |
| Fee level | USD 2145.6 |
| Validation Report |
Validation report (552 KB)
Public availability information Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 30/10/2013 |
| Registration Date | 20 Dec 12 |
| Renewal Period | 20 Dec 12 - 19 Dec 19 |
| PoA Duration | 11 Jun 12 - 10 Jun 40 |
| Requests for Issuance
and related documentation |
|

POA design document
Appendix 1 - ER_Programme for SSC Hydropower Plants in rural areas CPA#1_Final
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: