CPA 8824-P1-0001-CP1 : Programme for SSC Hydropower Plants in rural areas CPA # 1
PoA 8824: Programme for SSC Hydropower Plants in rural areas
CPA Programme for SSC Hydropower Plants in rural areas CPA # 1
cpa design document (907 KB)

Additional documents for this specific CPA
Appendix 1 - IRR_CPA-20121217-Final.xls (183 KB)
Appendix 2 - ER_Programme for SSC Hydropower Plants in rural areas CPA#1_Final.xlsx (39 KB)
Appendix 3 - Zhongtan_Rural Hydropower_CPA_FVR_16Dec2012_signed.pdf (596 KB)

Additional inclusion documents
CPA inclusion form (1020 KB)
Host Parties China
Amount of Reductions 18,228 metric tonnes CO2 equivalent per annum
Crediting Period 01 Sep 2015 - 31 Aug 2022 (Renewable - Expired) . No further renewal
Inclusion date 20 Dec 2012 (submitted at the time of requesting registration of the PoA)