PoA 6035 : UAE Solar Programme of Activities
PoA title UAE Solar Programme of Activities
- POA design document (1011 KB)

PoA DD appendices at the time of registration
Appendix 1 - OM EF of the ADWEA grid (120 KB)
Appendix 2 - EF DEWA calculation (248 KB)
Appendix 3 - EF FEWA calculation (250 KB)
Appendix 4 - UAE Solar PoA - Generic ER Calculation (46 KB)


- POA registration request form (139 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
CPAs

Initially submitted at the time of requesting registration of the POA:
- D001 Dubai 3 MW Photovoltaic Power Plant of the UAE Solar Programme of Activities

Host Parties United Arab Emirates , involved indirectly approval (127 KB) authorization (127 KB)
Authorized Participants: Dubai Carbon Centre of Excellence
Other Parties Involved n/a
Coordinating/Managing Entity Dubai Electricity & Water Authority (DEWA)
DOE AENOR
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodology Used ACM0002 ver. 13 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
VVS Version
Amount of Reductions (PoA) 3,928 metric tonnes CO2 equivalent per annum
Amount of Reductions (Initial CPAs) 3,928 metric tonnes CO2 equivalent per annum
Fee level USD 0.0
Validation Report Validation report (1313 KB)
Public availability information
Link to information uploaded for public availability
Modalities of Communication

Registration Date Withdrawn   (view history)
Renewal Period 7 years, starting from the date of registration of the PoA
PoA Duration 01 Oct 13 - 30 Sep 41