Project: 1865 Sinohydro Inner Mongolia Ximeng Honggeer Wind Power Project - Crediting Period Renewal Request
[]
Project 1865: Sinohydro Inner Mongolia Ximeng Honggeer Wind Power Project

- project design document (1009 KB)

PDD appendices
Appendix 1 - Emission Reduction calcultion for Sinohydro Ximeng Honggeer Wind (93 KB)

- crediting period renewal form (40 KB)
Methodologies Used ACM0002 ver. 16 - Grid-connected electricity generation from renewable sources
VVS Version VVS 9.0
Standardized baselines used N/A
Amount of Reductions 122,567 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (318 KB)
Renewal Date 06 Jan 16 (Renewable - Expired)   (view history)   completeness check: complete info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 25 Jan 16 - 24 Jan 23

Other crediting period(s): 25 Jan 09 - 24 Jan 16
Requests for Issuance
and related documentation