23:28 29 May 26
Project:
1865 Sinohydro Inner Mongolia Ximeng Honggeer Wind Power Project
- Crediting Period Renewal Request
[]
| Project |
1865: Sinohydro Inner Mongolia Ximeng Honggeer Wind Power Project
- project design document (1009 KB)
PDD appendices Appendix 1 - Emission Reduction calcultion for Sinohydro Ximeng Honggeer Wind (93 KB)
- crediting period renewal form (40 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 122,567 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (318 KB)
|
| Renewal Date |
06 Jan 16
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
25 Jan 16 - 24 Jan 23
Other crediting period(s): 25 Jan 09 - 24 Jan 16 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Emission Reduction calcultion for Sinohydro Ximeng Honggeer Wind
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: