Project: 3272 Guangxi Baise Dongsun Hydropower Project - Request for post-registration changes
Project 3272 Guangxi Baise Dongsun Hydropower Project
PRC ref PRC-3272-001
Process track Issuance
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 03 Dec 10 - 02 Dec 17
Assessment opinion Assessment opinion (882 KB)
Revised PDD Revised PDD (813 KB)   Revised PDD - track changes (897 KB)
Supplementary documents
Signed form Signed form (90 KB)
DOE clarification
VVS version VVS 2.0
Current status 22 Jan 13 - Approved
Effective approval date: 22 Jan 13
Historic statuses 24 Dec 12 - Request published