Project: 3272 Guangxi Baise Dongsun Hydropower Project - Crediting Period Renewal Request
[]
Project 3272: Guangxi Baise Dongsun Hydropower Project

- project design document (1184 KB)

PDD appendices
Appendix 1 - SCPG EF and Dongsun ER calculation sheet-20171114-dongsun (211 KB)
Appendix 2 - List of documents submitted_Dongsun (64 KB)

- crediting period renewal form (33 KB)
Methodologies Used ACM0002 ver. 17 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 1.0
Standardized baselines used N/A
Amount of Reductions 37,731 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (323 KB)
Renewal Date 31 Oct 18 (Renewable)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period (requested for renewal) 03 Dec 17 - 02 Dec 24

Other crediting period(s): 03 Dec 10 - 02 Dec 17
Requests for Issuance
and related documentation