18:31 30 Dec 24
Project:
3011 Hunan Lengshuijiang Langshitan 36MW Hydropower Project
- Request for post-registration changes
Project | 3011 Hunan Lengshuijiang Langshitan 36MW Hydropower Project |
---|---|
PRC ref | PRC-3011-001 |
Process track | Issuance |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 26 Jun 10 - 25 Jun 17 |
Assessment opinion | Assessment opinion (131 KB) |
Revised PDD | Revised PDD (808 KB) Revised PDD - track changes (878 KB) |
Supplementary documents | |
Signed form | Signed form (121 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 04 Dec 12 -
Approved
Effective approval date: 04 Dec 12
|
Historic statuses |
05 Nov 12 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: