Project: 1265 Chile: Quilleco Hydroelectric Project - Request for post-registration changes
Project 1265 Chile: Quilleco Hydroelectric Project
PRC ref PRC-1265-002
Process track Issuance
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 09 Jul 15 - 08 Jul 22
Assessment opinion Assessment opinion (312 KB)
Revised PDD Revised PDD (1191 KB)   Revised PDD - track changes (1300 KB)
Supplementary documents
Signed form Signed form (153 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 03 Jan 23 - Approved
Effective approval date: 03 Jan 23
Historic statuses 02 Dec 22 - Request published