Project: 6447 Zhejiang Tangcun 32MW Hydropower Project - Request for post-registration changes
Project 6447 Zhejiang Tangcun 32MW Hydropower Project
PRC ref PRC-6447-004
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2016 - 19 Jun 2019
Assessment opinion Assessment opinion (204 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (159 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 10 May 24 - Approved
Effective approval date: 10 May 24
Historic statuses 11 Apr 24 - Request published