Project:
1996 Sichuan Balangkou 96MW Hydropower Project
- Request for post-registration changes
Project | 1996 Sichuan Balangkou 96MW Hydropower Project |
---|---|
PRC ref | PRC-1996-001 |
Process track | Prior approval |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 30 Dec 09 - 29 Dec 16 |
Assessment opinion | Assessment opinion (198 KB) |
Revised PDD | Revised PDD (1148 KB) Revised PDD - track changes (490 KB) |
Supplementary documents | |
Signed form | Signed form (125 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 27 Sep 12 -
Approved
Effective approval date: 18 Sep 12
|
Historic statuses |
14 Aug 12 -
Published 14 Aug 12 - Summary note being prepared 28 Aug 12 - Awaiting EB decision |