Project: 1996 Sichuan Balangkou 96MW Hydropower Project - Request for post-registration changes
Project 1996 Sichuan Balangkou 96MW Hydropower Project
PRC ref PRC-1996-001
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 30 Dec 09 - 29 Dec 16
Assessment opinion Assessment opinion (198 KB)
Revised PDD Revised PDD (1148 KB)   Revised PDD - track changes (490 KB)
Supplementary documents
Signed form Signed form (125 KB)
DOE clarification
VVS version VVS 2.0
Current status 27 Sep 12 - Approved
Effective approval date: 18 Sep 12
Historic statuses 14 Aug 12 - Published
14 Aug 12 - Summary note being prepared
28 Aug 12 - Awaiting EB decision