13:10 16 Nov 25
Project:
1996 Sichuan Balangkou 96MW Hydropower Project
- Crediting Period Renewal Request
[]
| Project |
1996: Sichuan Balangkou 96MW Hydropower Project
- project design document (988 KB)
PDD appendices Appendix 1 - Balangkou-ER (87 KB)
- crediting period renewal form (111 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 215,441 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (555 KB)
|
| Renewal Date |
24 Aug 16
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
30 Dec 16 - 29 Dec 23
Other crediting period(s): 30 Dec 09 - 29 Dec 16 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Balangkou-ER
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: