16:58 07 Nov 25
Project:
8872 Rongnichu Hydroelectric Project (RHEP), India
- Request for post-registration changes
| Project | 8872 Rongnichu Hydroelectric Project (RHEP), India |
|---|---|
| PRC ref | PRC-8872-001 |
| Process track | Prior approval |
| DOE | LGAI Tech. Center S.A |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
Change to the start date of the crediting period
|
| Applicable crediting period | 01 Jan 14 - 31 Dec 20 |
| Assessment opinion |
Assessment opinion (321 KB)
|
| Revised PDD |
Revised PDD (661 KB)
Revised PDD - track changes (765 KB)
|
| Supplementary documents |
Appendix 1 - ER CDM UN 8872 TQC 33621.xls (108 KB)
Appendix 2 - IRR CDM UN 8872 TQC 33621.xls (346 KB)
|
| Signed form |
Signed form (227 KB)
|
| DOE clarification |
DOE clarification 1 - 22.03.02_PDD_8872_PRC_Clean.pdf (624 KB)
DOE clarification 2 - 22.03.02_PDD_8872_PRC_Track Change.pdf (849 KB)
DOE clarification 3 - 22.03.02_ER Sheet_8872.xls (71 KB)
DOE clarification 4 - 22.03.02_IRR sheet.act.xls.xlsx (137 KB)
DOE clarification 5 - FVR PRC CDM UN 8872 TQC 33621.pdf (203 KB)
DOE clarification 6 - 22.03.02_Response_8872.pdf (16 KB)
|
| VVS version | VVS-PA 3.0 |
| Current status | 11 Jun 22 -
Rejected
Effective rejection date: 02 Jun 22.
Reason (71 KB)
|
| Historic statuses |
17 Jan 22 -
Published 22 Feb 22 - Awaiting DOE clarifications 08 Mar 22 - DOE clarifications received 08 Mar 22 - Summary note being prepared 23 Mar 22 - Request added to EB114 meeting agenda |

Assessment opinion
Appendix 1 - ER CDM UN 8872 TQC 33621.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: