Project: 8872 Rongnichu Hydroelectric Project (RHEP), India - Request for post-registration changes
Project 8872 Rongnichu Hydroelectric Project (RHEP), India
PRC ref PRC-8872-001
Process track Prior approval
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Increase in the capacity

Change to the start date of the crediting period
  • Proposed start date of crediting period: 31 Dec 2020
Applicable crediting period 01 Jan 14 - 31 Dec 20
Assessment opinion Assessment opinion (321 KB)
Revised PDD Revised PDD (661 KB)   Revised PDD - track changes (765 KB)
Supplementary documents Appendix 1 - ER CDM UN 8872 TQC 33621.xls (108 KB)
Appendix 2 - IRR CDM UN 8872 TQC 33621.xls (346 KB)
Signed form Signed form (227 KB)
DOE clarification DOE clarification 1 - 22.03.02_PDD_8872_PRC_Clean.pdf (624 KB)
DOE clarification 2 - 22.03.02_PDD_8872_PRC_Track Change.pdf (849 KB)
DOE clarification 3 - 22.03.02_ER Sheet_8872.xls (71 KB)
DOE clarification 4 - 22.03.02_IRR sheet.act.xls.xlsx (137 KB)
DOE clarification 5 - FVR PRC CDM UN 8872 TQC 33621.pdf (203 KB)
DOE clarification 6 - 22.03.02_Response_8872.pdf (16 KB)
VVS version VVS-PA 3.0
Current status 11 Jun 22 - Rejected
Effective rejection date: 02 Jun 22. Reason (71 KB)
Historic statuses 17 Jan 22 - Published
22 Feb 22 - Awaiting DOE clarifications
08 Mar 22 - DOE clarifications received
08 Mar 22 - Summary note being prepared
23 Mar 22 - Request added to EB114 meeting agenda