Project: 0904 Guangrun Hydropower Project in Hubei Province, P.R. China - Request for post-registration changes
Project 0904 Guangrun Hydropower Project in Hubei Province, P.R. China
PRC ref PRC-0904-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 30 Jun 09 - 29 Jun 16
Assessment opinion Assessment opinion (758 KB)
Revised PDD Revised PDD (1465 KB)   Revised PDD - track changes (1648 KB)
Supplementary documents Appendix 1 - IRR calculation spreadsheet_Guangrun_20140805.xls (189 KB)
Appendix 2 - Registered PDD in the latest template_cl.pdf (1193 KB)
Signed form Signed form (52 KB)
DOE clarification
VVS version VVS 2.0
Current status 26 Feb 15 - Approved
Effective approval date: 26 Feb 15
Historic statuses 28 Jan 15 - Request published