18:44 14 Jan 25
Project:
0904 Guangrun Hydropower Project in Hubei Province, P.R. China
- Request for post-registration changes
Project | 0904 Guangrun Hydropower Project in Hubei Province, P.R. China |
---|---|
PRC ref | PRC-0904-001 |
Process track | Issuance |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 30 Jun 09 - 29 Jun 16 |
Assessment opinion | Assessment opinion (758 KB) |
Revised PDD | Revised PDD (1465 KB) Revised PDD - track changes (1648 KB) |
Supplementary documents |
Appendix 1 - IRR calculation spreadsheet_Guangrun_20140805.xls (189 KB)
Appendix 2 - Registered PDD in the latest template_cl.pdf (1193 KB) |
Signed form | Signed form (52 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 26 Feb 15 -
Approved
Effective approval date: 26 Feb 15
|
Historic statuses |
28 Jan 15 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: