10632 Hasang Hydro Electric Power Plant
- Request for post-registration changes
| Project | 10632 Hasang Hydro Electric Power Plant |
|---|---|
| PRC ref | PRC-10632-002 |
| Process track | Issuance |
| DOE | KSA |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 23 Dec 20 - 22 Dec 30 |
| Assessment opinion |
Assessment opinion (646 KB)
|
| Revised PDD |
Revised PDD (1644 KB)
Revised PDD - track changes (1745 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (275 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 04 May 23 - Request published |