Project: 10632 Hasang Hydro Electric Power Plant - Request for post-registration changes
Project 10632 Hasang Hydro Electric Power Plant
PRC ref PRC-10632-002
Process track Issuance
DOE KSA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 23 Dec 20 - 22 Dec 30
Assessment opinion Assessment opinion (646 KB)
Revised PDD Revised PDD (1644 KB)   Revised PDD - track changes (1745 KB)
Supplementary documents
Signed form Signed form (275 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 04 May 23 - Request published