20:48 19 Nov 25
Project:
0784 Yangyang Renewable Energy Project (3MW Wind Power + 1.4MW Small Hydroelectric Power)
- Crediting Period Renewal Request
[]
| Project |
0784: Yangyang Renewable Energy Project (3MW Wind Power + 1.4MW Small Hydroelectric Power)
- project design document (3872 KB)
PDD appendices Appendix 1 - ER calculation sheet (206 KB)
- crediting period renewal form (75 KB)
|
|---|---|
| Methodologies Used |
AMS-I.D. ver. 17 -
Grid connected renewable electricity generation
|
| VVS Version | |
| Standardized baselines used | N/A |
| Amount of Reductions | 9,009 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (409 KB)
|
| Renewal Date |
25 Mar 14
(Renewable - Expired)
(view history)
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
10 Feb 14 - 09 Feb 21
Other crediting period(s): 10 Feb 07 - 09 Feb 14 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER calculation sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: