Project: 9964 5 MW Solar PV Power Project at NTPC Faridabad - Request for post-registration changes
Project 9964 5 MW Solar PV Power Project at NTPC Faridabad
PRC ref PRC-9964-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jun 14 - 31 May 21
Assessment opinion Assessment opinion (143 KB)
Revised PDD Revised PDD (716 KB)   Revised PDD - track changes (733 KB)
Supplementary documents
Signed form Signed form (32 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Sep 18 - Approved
Effective approval date: 07 Sep 18
Historic statuses 09 Aug 18 - Request published