Project: 8427 Los Hierros Hydroelectric Power Plant - Request for post-registration changes
Project 8427 Los Hierros Hydroelectric Power Plant
PRC ref PRC-8427-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 12 Apr 2014 - 28 Feb 2017

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 12 Apr 14 - 11 Apr 21
Assessment opinion Assessment opinion (240 KB)
Revised PDD Revised PDD (1807 KB)   Revised PDD - track changes (828 KB)
Supplementary documents Appendix 1 - ERs spreadsheet v6.xlsx (41 KB)
Appendix 2 - MR_form07v09 - Los Hierros v9.1 clean.pdf (930 KB)
Signed form Signed form (130 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 30 Jun 22 - Approved
Effective approval date: 30 Jun 22
Historic statuses 01 Jun 22 - Request published