20:11 28 Dec 24
Project:
8427 Los Hierros Hydroelectric Power Plant
- Request for post-registration changes
Project | 8427 Los Hierros Hydroelectric Power Plant |
---|---|
PRC ref | PRC-8427-001 |
Process track | Issuance |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 12 Apr 14 - 11 Apr 21 |
Assessment opinion | Assessment opinion (240 KB) |
Revised PDD | Revised PDD (1807 KB) Revised PDD - track changes (828 KB) |
Supplementary documents |
Appendix 1 - ERs spreadsheet v6.xlsx (41 KB)
Appendix 2 - MR_form07v09 - Los Hierros v9.1 clean.pdf (930 KB) |
Signed form | Signed form (130 KB) |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 30 Jun 22 -
Approved
Effective approval date: 30 Jun 22
|
Historic statuses |
01 Jun 22 -
Request published |