Project: 1787 Valdivia biomass power plant - Request for post-registration changes
Project 1787 Valdivia biomass power plant
PRC ref PRC-1787-003
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 09 Jul 2013 - 25 Jul 2013

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Apr 09 - 31 Mar 16
Assessment opinion Assessment opinion (1014 KB)
Revised PDD Revised PDD (2544 KB)   Revised PDD - track changes (2635 KB)
Supplementary documents Appendix 1 - Valdivia ex ante ER drier 151104.xls (249 KB)
Signed form Signed form (95 KB)
DOE clarification
VVS version VVS 7.0
Current status 17 Mar 16 - Approved
Effective approval date: 17 Mar 16
Historic statuses 17 Feb 16 - Request published