Project: 3115 17.6 MW captive grid connected electricity generation from wind energy project by Chennai Petroleum Corporation Limited. - Request for post-registration changes
Project 3115 17.6 MW captive grid connected electricity generation from wind energy project by Chennai Petroleum Corporation Limited.
PRC ref PRC-3115-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 06 May 10 - 05 May 20
Assessment opinion Assessment opinion (505 KB)
Revised PDD Revised PDD (934 KB)   Revised PDD - track changes (1031 KB)
Supplementary documents
Signed form Signed form (33 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Apr 15 - Approved
Effective approval date: 07 Apr 15
Historic statuses 05 Mar 15 - Request published