Project: 7789 Punta Pereira biomass power plant. - Request for post-registration changes
Project 7789 Punta Pereira biomass power plant.
PRC ref PRC-7789-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 30 Apr 2014 - 31 Dec 2016

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 30 Apr 14 - 29 Apr 21
Assessment opinion Assessment opinion (1533 KB)
Revised PDD Revised PDD (3051 KB)   Revised PDD - track changes (3071 KB)
Supplementary documents Appendix 1 - 7789-20121019-ER SHEET 15122017.xls (250 KB)
Signed form Signed form (50 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 26 Apr 18 - Approved
Effective approval date: 26 Apr 18
Historic statuses 28 Mar 18 - Request published