Project:
7789 Punta Pereira biomass power plant.
- Request for post-registration changes
Project | 7789 Punta Pereira biomass power plant. |
---|---|
PRC ref | PRC-7789-001 |
Process track | Issuance |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 30 Apr 14 - 29 Apr 21 |
Assessment opinion | Assessment opinion (1533 KB) |
Revised PDD | Revised PDD (3051 KB) Revised PDD - track changes (3071 KB) |
Supplementary documents |
Appendix 1 - 7789-20121019-ER SHEET 15122017.xls (250 KB)
|
Signed form | Signed form (50 KB) |
DOE clarification | |
VVS version | VVS-PA 1.0 |
Current status | 26 Apr 18 -
Approved
Effective approval date: 26 Apr 18
|
Historic statuses |
28 Mar 18 -
Request published |