Project:
1620 Hedcor Sibulan 42.5 MW Hydroelectric Power Project
- Request for post-registration changes
Project | 1620 Hedcor Sibulan 42.5 MW Hydroelectric Power Project |
---|---|
PRC ref | PRC-1620-003 |
Process track | Issuance |
DOE | CTI Certification |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 26 Feb 10 - 25 Feb 17 |
Assessment opinion | Assessment opinion (557 KB) |
Revised PDD | Revised PDD (1470 KB) Revised PDD - track changes (1472 KB) |
Supplementary documents | |
Signed form | Signed form (1809 KB) |
DOE clarification | |
VVS version | VVS 9.0 |
Current status | 10 Aug 17 -
Approved
Effective approval date: 10 Aug 17
|
Historic statuses |