Project: 8767 Cerro Pabellon Geothermal Project (Apacheta) - Request for post-registration changes
Project 8767 Cerro Pabellon Geothermal Project (Apacheta)
PRC ref PRC-8767-001
Process track Prior approval
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Increase in the capacity, Confirmation that the submission of this form is within two years of the commissioning or implementation, whichever is later, Changes to the technologies/measures, None of the above
Applicable crediting period 01 Jan 15 - 31 Dec 21
Assessment opinion Assessment opinion (408 KB)
Revised PDD Revised PDD (1408 KB)   Revised PDD - track changes (1491 KB)
Supplementary documents Appendix 1 - supplemental documents.zip (215 KB)
Signed form Signed form (179 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 21 Feb 23 - Approved
Effective approval date: 20 Feb 23
Historic statuses 16 Jan 23 - Published
16 Jan 23 - Summary note being prepared
31 Jan 23 - Awaiting EB decision