Project: 10194 5MW Thap Sakae Photovoltaic Solar Cell Power Plant Project, Thailand - Request for post-registration changes
Project 10194 5MW Thap Sakae Photovoltaic Solar Cell Power Plant Project, Thailand
PRC ref PRC-10194-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Aug 16 - 30 Jul 24
Assessment opinion Assessment opinion (782 KB)
Revised PDD Revised PDD (1156 KB)   Revised PDD - track changes (1142 KB)
Supplementary documents
Signed form Signed form (219 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 02 May 18 - Approved
Effective approval date: 02 May 18
Historic statuses 03 Apr 18 - Request published