Project:
7727 Grid connected combined cycle power plant project in Qadirpur utilizing permeate gas, previously flared
- Request for post-registration changes
Project | 7727 Grid connected combined cycle power plant project in Qadirpur utilizing permeate gas, previously flared |
---|---|
PRC ref | PRC-7727-001 |
Process track | Issuance |
DOE | EPIC |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
Assessment opinion | Assessment opinion (412 KB) |
Revised PDD | |
Supplementary documents | |
Signed form | Signed form (247 KB) |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 04 Oct 22 -
Approved
Effective approval date: 04 Oct 22
|
Historic statuses |
02 Sep 22 -
Request published |