Project: 7727 Grid connected combined cycle power plant project in Qadirpur utilizing permeate gas, previously flared - Request for post-registration changes
Project 7727 Grid connected combined cycle power plant project in Qadirpur utilizing permeate gas, previously flared
PRC ref PRC-7727-001
Process track Issuance
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2013 - 31 Dec 2019
Assessment opinion Assessment opinion (412 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (247 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 04 Oct 22 - Approved
Effective approval date: 04 Oct 22
Historic statuses 02 Sep 22 - Request published