10:01 10 Jan 25
Project:
3054 Henan Xinxiang 24MW Biomass based Cogeneration Project
- Request for post-registration changes
Project | 3054 Henan Xinxiang 24MW Biomass based Cogeneration Project |
---|---|
PRC ref | PRC-3054-001 |
Process track | Issuance |
DOE | TUV RHEIN |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 11 Jul 11 - 10 Jul 18 |
Assessment opinion | Assessment opinion (1298 KB) |
Revised PDD | Revised PDD (1070 KB) Revised PDD - track changes (1093 KB) |
Supplementary documents | |
Signed form | Signed form (855 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 24 May 13 -
Approved
Effective approval date: 24 May 13
|
Historic statuses |
25 Apr 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: