Project: 1759 Shuangbai Ejia Magahe River Hydropower Project - Request for post-registration changes
Project 1759 Shuangbai Ejia Magahe River Hydropower Project
PRC ref PRC-1759-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 24 Dec 08 - 23 Dec 15
Assessment opinion Assessment opinion (193 KB)
Revised PDD Revised PDD (555 KB)   Revised PDD - track changes (594 KB)
Supplementary documents
Signed form Signed form (342 KB)
DOE clarification
VVS version VVS 2.0
Current status 14 Mar 13 - Approved
Effective approval date: 14 Mar 13
Historic statuses 13 Feb 13 - Request published