17:58 16 Nov 25
Project:
1759 Shuangbai Ejia Magahe River Hydropower Project
- Crediting Period Renewal Request
[]
| Project |
1759: Shuangbai Ejia Magahe River Hydropower Project
- project design document (543 KB)
PDD appendices Appendix 1 - Shuangbai Ejia Magahe River Hydropower Project(1759)-ER sheet-V07 (27 KB)
- crediting period renewal form (111 KB)
|
|---|---|
| Methodologies Used |
AMS-I.D. ver. 18 -
Grid connected renewable electricity generation
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 23,569 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (306 KB)
|
| Renewal Date |
05 Dec 20
(Renewable - Expired)
(view history)
completeness check
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
24 Dec 15 - 23 Dec 22
Other crediting period(s): 24 Dec 08 - 23 Dec 15 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Shuangbai Ejia Magahe River Hydropower Project(1759)-ER sheet-V07
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: