Project: 6573-P2-0001-CP2 CPA-1: Landfill gas recovery, energy generation and biogas distribution from CTR Santa Rosa - Request for post-registration changes
Project 6573-P2-0001-CP2 CPA-1: Landfill gas recovery, energy generation and biogas distribution from CTR Santa Rosa
PRC ref PRC-6573-003
Process track CPA-PRC
DOE RINA
Type of submission Permanent changes from the monitoring plan or the monitoring methodology

Changes to the project or programme design
  • Is the change to increase the capacity specified in the included CPA-DD? Yes Date of the commissioning or implementation of the change: 20 Jan 2022 Is the change to decrease the capacity specified in the included CPA-DD? No Is the change to add new components or extend/add technologies/measures or introduce complementary technologies/measures? No Date of the commissioning or implementation of the change:
Applicable crediting period 05 Oct 19 - 04 Oct 26
Assessment opinion Assessment opinion (440 KB)
Revised CPA-DD Revised CPA-DD (2036 KB)   Revised CPA-DD - track changes (2478 KB)
Supplementary documents Appendix 1 - CER Santa Rosa - V.9.1.xlsx (374 KB)
Signed form Signed form (89 KB)
DOE clarification DOE clarification 1 - FVR_2021BQMD72_2.0Aa_16022022.pdf (440 KB)
DOE clarification 2 - CPA-DD Santa Rosa v.9.2_clean.pdf (2036 KB)
DOE clarification 3 - CPA-DD Santa Rosa v.9.2_changes tracked.pdf (2478 KB)
VVS version VVS-PoA 3.0
Current status 16 Mar 22 - Approved
Effective approval date: 15 Mar 22
Historic statuses 31 Jan 22 - Published
09 Feb 22 - Awaiting DOE clarifications
17 Feb 22 - DOE clarifications received
17 Feb 22 - Summary note being prepared
23 Feb 22 - Awaiting EB decision